Skip to main content
    Back to Coffee Guides
    US Import Compliance

    FDA Requirements for Importing Ethiopian Green Coffee into the US

    Prior Notice, food facility registration and the Foreign Supplier Verification Program — what each rule asks of a US roaster or importer buying green coffee from Ethiopia.

    Published: October 15, 2026 · Jurisdiction: United States (federal)

    Which FDA Rules Apply to a Green Coffee Shipment?

    Three FDA rules apply to Ethiopian green coffee entering the United States. Prior Notice must be filed and confirmed at least 8 hours before an ocean shipment arrives. The foreign facility that packs or holds the coffee must hold an FDA food facility registration, renewed between 1 October and 31 December of every even-numbered year — including now, in 2026. And the US importer needs a Foreign Supplier Verification Program (FSVP), in which green coffee benefits from a specific provision because it cannot be consumed without roasting.

    These rules sit in Title 21 of the US Code of Federal Regulations, Part 1. They are separate from customs duties and tariffs, which are set by the US tariff schedule and administered by US Customs and Border Protection (CBP); your customs broker confirms the classification and any duty for each entry. For the commercial side of buying from Ethiopia — contracts, FOB Djibouti terms, export documents and transit times — see our wholesale import guide and the US wholesale page.

    Rules summarised from 21 CFR Part 1 as published on eCFR (version of 1 October 2026) and FDA guidance pages, reviewed 15 October 2026. This is general information, not legal or regulatory advice for a particular shipment.

    1. FDA Prior Notice: Deadlines and What It Contains

    Prior Notice applies to all food imported or offered for import into the United States — and FDA's scope expressly includes trade samples and quality-assurance/quality-control samples (21 CFR 1.277). A green coffee container and a sample parcel for cupping are both covered. The notice only counts as submitted once FDA confirms it and issues a Prior Notice (PN) Confirmation Number (21 CFR 1.279(d)).

    How the coffee arrivesPrior Notice must be confirmed
    Ocean (container from Djibouti)At least 8 hours before arrival at the US port
    Air (including samples flown in by express courier)At least 4 hours before arrival
    International mail (e.g. small sample parcels)Before the parcel is sent to the United States

    There is also an earliest filing date: no more than 30 calendar days before arrival when filed through CBP's ABI/ACE system (the route customs brokers normally use), or 15 days when filed directly in FDA's Prior Notice System Interface (21 CFR 1.279(b)).

    The notice identifies the coffee by its FDA product code, common name and quantity; the manufacturer (with its registration number) for food no longer in its natural state, or the grower or consolidator for food that is; the shipper; the country it is shipped from; and the anticipated port and date of arrival (21 CFR 1.281(a)). In practice your broker files it, using the details on the exporter's commercial invoice and bill of lading.

    Samples sent by international mail

    For food sent by international mail, Prior Notice must be filed before the parcel is posted, and the PN Confirmation Number must appear on the customs declaration (CN22/CN23) (21 CFR 1.279(c) and (e)). From 1 October 2026 a mail Prior Notice must also give the name of the mail service and the tracking number (21 CFR 1.281(b)). If you request green coffee samples, agree with the sender who files the notice before anything ships.

    2. Food Facility Registration — and the 2026 Renewal Window

    Any facility, in the US or abroad, that manufactures/processes, packs or holds food for consumption in the United States must register with FDA before it starts doing so (21 CFR 1.230(a)). "Holding" means storage and activities incidental to storage (21 CFR 1.227). Farms are exempt (21 CFR 1.226(b)). A foreign facility is also exempt if its food is further processed by another facility outside the US before export (21 CFR 1.226(a)) — which does not help when the green coffee is roasted after it reaches the US.

    A foreign facility's registration must include a unique facility identifier and the name and contact details of its US agent (21 CFR 1.232).

    Renewal is due now. Registrations must be renewed every other year, between 1 October and 31 December of each even-numbered year (21 CFR 1.230(b)). 2026 is a renewal year, so for shipments planned for the 2026/27 crop, ask your exporter for the FDA registration number of the facility that last packs or holds your coffee and confirm it has been renewed in this window.

    3. FSVP: Who the Importer Is and the Green Coffee Provision

    Under the Foreign Supplier Verification Program rule, the "importer" is the US owner or consignee of the food when it is offered for import. If there is none, it is the US agent or representative of the foreign owner, who must sign a statement consenting to act as importer (21 CFR 1.500). That importer must develop, maintain and follow an FSVP for each food it imports (21 CFR 1.502), and must be identified electronically — name, email address and a unique facility identifier — for each line entry filed with CBP (21 CFR 1.509(a)).

    Green coffee has a specific route through the rule. Where the importer identifies a hazard requiring a control and determines and documents that the type of food could not be consumed without that control — the regulation's own examples are "raw agricultural commodities such as cocoa beans and coffee beans" — the importer is not required to carry out the foreign supplier evaluation or supplier verification activities (21 CFR 1.507(a)(1)). FDA's FSVP overview gives coffee beans as an example of this circumstance.

    That is a documented determination, not a blanket exemption: the importer still has an FSVP, keeps the record, and is identified at entry. Many roasters use a consultant or their broker to set this up; FDA's FSMA Technical Assistance Network answers questions on the rule.

    Pre-Shipment Checklist for US Buyers

    Prior Notice confirmation number

    Who provides it
    Your customs broker (or whoever files the entry)
    Rule
    21 CFR 1.279 and 1.281

    FDA registration number of the foreign facility that packs or holds the coffee, renewed for the 2026 cycle

    Who provides it
    Your exporter
    Rule
    21 CFR 1.226, 1.230 and 1.232

    A named FSVP importer for each line entry (name, email, unique facility identifier)

    Who provides it
    The US owner or consignee, or a designated US agent
    Rule
    21 CFR 1.500 and 1.509

    Written FSVP record that green coffee cannot be consumed without roasting

    Who provides it
    The FSVP importer
    Rule
    21 CFR 1.507(a)(1)

    Alongside these FDA items, each shipment travels with the export documents listed in our import guide. Quality and grade are a separate question — see the Grade 1 vs Grade 2 guide.

    Sources

    Regulations change. Check the current eCFR text and FDA guidance, and confirm requirements for a specific entry with your customs broker, before you ship.

    Common Questions

    Frequently Asked Questions

    How far ahead must FDA Prior Notice be filed for a coffee container?

    For food arriving by water, Prior Notice must be submitted and confirmed by FDA at least 8 hours before arrival at the US port (21 CFR 1.279(a)(4)). Filed through CBP's ABI/ACE system it can be submitted up to 30 calendar days before arrival; through FDA's Prior Notice System Interface, up to 15 days.

    Do green coffee samples need FDA Prior Notice?

    Yes. The Prior Notice rule covers food imported for trade and quality-assurance/quality-control samples (21 CFR 1.277). Samples sent by international mail need Prior Notice before posting, with the confirmation number on the CN22/CN23 declaration, and from 1 October 2026 the mail service name and tracking number.

    When is the 2026 FDA food facility registration renewal?

    Registered food facilities must renew between 1 October and 31 December of each even-numbered year (21 CFR 1.230(b)), so the current window runs from 1 October to 31 December 2026.

    Does a US roaster importing green coffee need an FSVP?

    The FSVP importer — the US owner or consignee at entry, or a designated US agent — needs an FSVP for each food it imports (21 CFR 1.502). For green coffee, an importer that documents that the coffee cannot be consumed without a control such as roasting is not required to perform supplier evaluation or verification activities (21 CFR 1.507(a)(1)), but must still keep its FSVP and be identified at entry.

    Does this cover US import duties on Ethiopian coffee?

    No. FDA rules are separate from customs duties and tariffs, which are administered by US Customs and Border Protection and can change with trade measures. Your customs broker confirms the classification and any duty that applies to each entry.

    Planning a US Shipment?

    Tell us your port, volume and timing, and we will work through the shipping documents your customs broker needs for the entry.